Package Name | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor | ||||||
Code | 6233298 | ||||||
HPS | Rp 380.634.440 | ||||||
Ceiling | Rp 380.675.300 | ||||||
Instance | - | ||||||
Business Qualification | Small | ||||||
Category | Pekerjaan Konstruksi | ||||||
procurement.lelang_method | |||||||
Fiscal Year | 2024 | ||||||
Evaluation Method | Sistem Gugur | ||||||
Kontrak |
|
||||||
Location | Kab. Sanggau-Sanggau (Kab.)-Kalimantan Barat | ||||||
LPSE | LPSE Kabupaten Sanggau | ||||||
Procurement Detail Link | Link Tidak Aktif | ||||||
STK | |||||||
Requirements |
Stage | Start | End |
---|---|---|
Pengumuman Pascakualifikasi | 13 Aug 2024 | 19 Aug 2024 |
Download Dokumen Pengadaan | 13 Aug 2024 | 19 Aug 2024 |
Pemberian Penjelasan | 16 Aug 2024 | 16 Aug 2024 |
Upload Dokumen Penawaran | 16 Aug 2024 | 19 Aug 2024 |
Pembukaan Dokumen Penawaran | 19 Aug 2024 | 20 Aug 2024 |
Tidak Ada Jadwal | 19 Aug 2024 | 20 Aug 2024 |
Pembuktian Kualifikasi | 19 Aug 2024 | 20 Aug 2024 |
Penetapan Pemenang | 20 Aug 2024 | 20 Aug 2024 |
Pengumuman Pemenang | 20 Aug 2024 | 20 Aug 2024 |
Masa Sanggah Hasil Lelang | 20 Aug 2024 | 26 Aug 2024 |
Surat Penunjukan Penyedia Barang/Jasa | 26 Aug 2024 | 3 Sep 2024 |
Penandatanganan Kontrak | 26 Aug 2024 | 9 Sep 2024 |