Package Name | Rehabilitasi Ruang Kelas dengan Tingkat Kerusakan Minimal Sedang UPTD Satuan Pendidikan SMPN 17 Marusu Desa Tellumpoccoe Kec. Marusu | ||||||
Code | 8852250 | ||||||
HPS | Rp 600.000.000 | ||||||
Ceiling | Rp 600.000.000 | ||||||
Instance | - | ||||||
Business Qualification | Small | ||||||
Category | Pekerjaan Konstruksi | ||||||
procurement.lelang_method | |||||||
Fiscal Year | 2024 | ||||||
Evaluation Method | Sistem Gugur | ||||||
Kontrak |
|
||||||
Location | Kec. Marusu-Maros (Kab.)-Sulawesi Selatan | ||||||
LPSE | LPSE Kabupaten Maros | ||||||
Procurement Detail Link | Link Tidak Aktif | ||||||
STK | |||||||
Requirements |
Stage | Start | End |
---|---|---|
Pengumuman Pascakualifikasi | 13 Aug 2024 | 19 Aug 2024 |
Download Dokumen Pengadaan | 13 Aug 2024 | 19 Aug 2024 |
Pemberian Penjelasan | 16 Aug 2024 | 16 Aug 2024 |
Upload Dokumen Penawaran | 16 Aug 2024 | 19 Aug 2024 |
Pembukaan Dokumen Penawaran | 19 Aug 2024 | 19 Aug 2024 |
Tidak Ada Jadwal | 19 Aug 2024 | 22 Aug 2024 |
Pembuktian Kualifikasi | 23 Aug 2024 | 23 Aug 2024 |
Penetapan Pemenang | 23 Aug 2024 | 26 Aug 2024 |
Pengumuman Pemenang | 26 Aug 2024 | 26 Aug 2024 |
Masa Sanggah Hasil Lelang | 26 Aug 2024 | 2 Sep 2024 |
Surat Penunjukan Penyedia Barang/Jasa | 2 Sep 2024 | 6 Sep 2024 |
Penandatanganan Kontrak | 3 Sep 2024 | 17 Sep 2024 |